The spring decoration is very good, but we have to pay attention to a few points to make the home improvement project more smooth.
Moisture-proof, the quality of moisture-proof work directly affects the quality of decoration, and the future living environment, please pay special attention to the following points:
1.The placement of materials, especially some wooden materials, it is best to put some moisture-proof products, such as cardboard and newspapers on the ground, the best way to prevent moisture is to put them in the air. Especially after the timber is bought back, it should be placed in the house for two or three days, and construction should be carried out according to local conditions. Before construction, keep the ground dry and lay a moisture-proof layer. In this way, the wood is basically not deformed.
2. Details during the construction process.
The key to the quality of home improvement projects is construction, and special attention should be paid during construction. After installation, all wood products need to be painted once. This kind of paint called "topcoat" can not only protect the wood products, but also play a role in isolating moisture and maintaining the normal moisture content of the wood. water.
3. Pay attention to insulation work when laying lines and floor tiles to prevent the lines from working properly due to moisture, and even bring potential dangers. After the floor tiles are paved, the carpenter cannot enter the field immediately. It is best to let it air dry for a period of time, preferably half a month. Because wet weather will slow down the setting rate of cement, floor tiles cannot be trampled immediately after laying.
4. Paint works should avoid spraying paint on rainy days as much as possible, because on rainy days, there will be a layer of water vapor on the board, paint will change the performance and color, which has a great impact on the quality of decoration. When applying latex paint on the wall, the drying time of the wall after painting should also be extended. In addition, in the coating construction process, the base primer cannot be saved.
Moisture-proof, the quality of moisture-proof work directly affects the quality of decoration, and the future living environment, please pay special attention to the following points:
1.The placement of materials, especially some wooden materials, it is best to put some moisture-proof products, such as cardboard and newspapers on the ground, the best way to prevent moisture is to put them in the air. Especially after the timber is bought back, it should be placed in the house for two or three days, and construction should be carried out according to local conditions. Before construction, keep the ground dry and lay a moisture-proof layer. In this way, the wood is basically not deformed.
2. Details during the construction process.
The key to the quality of home improvement projects is construction, and special attention should be paid during construction. After installation, all wood products need to be painted once. This kind of paint called "topcoat" can not only protect the wood products, but also play a role in isolating moisture and maintaining the normal moisture content of the wood. water.
3. Pay attention to insulation work when laying lines and floor tiles to prevent the lines from working properly due to moisture, and even bring potential dangers. After the floor tiles are paved, the carpenter cannot enter the field immediately. It is best to let it air dry for a period of time, preferably half a month. Because wet weather will slow down the setting rate of cement, floor tiles cannot be trampled immediately after laying.
4. Paint works should avoid spraying paint on rainy days as much as possible, because on rainy days, there will be a layer of water vapor on the board, paint will change the performance and color, which has a great impact on the quality of decoration. When applying latex paint on the wall, the drying time of the wall after painting should also be extended. In addition, in the coating construction process, the base primer cannot be saved.
5. Fire prevention in some areas in spring, air is dry and windy. In addition, some materials such as paints and coatings are flammable for decoration. Therefore, in the spring decoration project, fire prevention is also a problem that requires special attention.
3. Anti-drying
1. Control of wood temperature and humidity. Wood is an indispensable material in decoration. The factors that affect wood are humidity and temperature. Because the wind is dry in spring, the wood to be bought should be placed in the house for two or three days to adapt to the temperature and humidity. A pot of water can be placed indoors to dry the wood naturally, and it is also important to seal the oil in time to avoid excessive moisture loss of the wood due to strong winds, curling, and cracking.
2. Putty construction should be carried out in strict accordance with the product manual.
Due to the high alkali content of most of the walls, you should choose the appropriate putty according to the room type when choosing putty. At present, there are three kinds of putty on the home improvement market: the first generation of putty paste, the second generation of wall lining and the third generation of negative ions Of course, the effects of these processes also have advantages and disadvantages. In the construction process, pay attention to the method of blending putty and strictly follow the product manual to ensure the quality of the product while ensuring the decorative effect, otherwise even the best product, improper operation will also produce adverse effects.
3. Spring ventilation should be moderate.
After the spring decoration, due to the different internal moisture content of the ceiling and the wall, the rate of change between the inside and outside is inconsistent, and cracks are likely to occur during ventilation. Observe and observe that cracks on the top and walls caused by rapid ventilation during this period are very common. As long as each window is not too large, while ensuring a certain indoor temperature can solve the above problems. For example, use alternate ventilation, but do not open all doors and windows at the same time.
4. Pollution prevention and control.
Now consumers pay more and more attention to the environmental protection of home decoration projects. In order to avoid the pollution caused by the decoration to the interior, you should try to choose a simple decoration style and environmentally friendly decoration materials. Most decorative paints will release a variety of volatile organic compounds, which is very harmful to human health. There should be a certain exhaust period after decoration. Traditional wooden furniture is best placed for a period of time, which is conducive to the evaporation of volatile substances. Compared with formaldehyde in paint.
3. Anti-drying
1. Control of wood temperature and humidity. Wood is an indispensable material in decoration. The factors that affect wood are humidity and temperature. Because the wind is dry in spring, the wood to be bought should be placed in the house for two or three days to adapt to the temperature and humidity. A pot of water can be placed indoors to dry the wood naturally, and it is also important to seal the oil in time to avoid excessive moisture loss of the wood due to strong winds, curling, and cracking.
2. Putty construction should be carried out in strict accordance with the product manual.
Due to the high alkali content of most of the walls, you should choose the appropriate putty according to the room type when choosing putty. At present, there are three kinds of putty on the home improvement market: the first generation of putty paste, the second generation of wall lining and the third generation of negative ions Of course, the effects of these processes also have advantages and disadvantages. In the construction process, pay attention to the method of blending putty and strictly follow the product manual to ensure the quality of the product while ensuring the decorative effect, otherwise even the best product, improper operation will also produce adverse effects.
3. Spring ventilation should be moderate.
After the spring decoration, due to the different internal moisture content of the ceiling and the wall, the rate of change between the inside and outside is inconsistent, and cracks are likely to occur during ventilation. Observe and observe that cracks on the top and walls caused by rapid ventilation during this period are very common. As long as each window is not too large, while ensuring a certain indoor temperature can solve the above problems. For example, use alternate ventilation, but do not open all doors and windows at the same time.
4. Pollution prevention and control.
Now consumers pay more and more attention to the environmental protection of home decoration projects. In order to avoid the pollution caused by the decoration to the interior, you should try to choose a simple decoration style and environmentally friendly decoration materials. Most decorative paints will release a variety of volatile organic compounds, which is very harmful to human health. There should be a certain exhaust period after decoration. Traditional wooden furniture is best placed for a period of time, which is conducive to the evaporation of volatile substances. Compared with formaldehyde in paint.